blog

Your overall manufacturing workflow.

I'd put this near the bottom of the page.

 

From Engineering Requirement to Finished Component

 

01 — Engineering

Machine/Product Design → 3D CAD → 2D Drawing → GD&T → DFM

↓

02 — Material

Customer-Supplied Material
or
Material Procurement

↓

03 — Manufacturing

CNC Turning → VMC → Grinding → EDM

↓

04 — Inspection

Dimensional → Bore → Surface Roughness → Hardness

↓

05 — Finished Component

Inspection Documentation → Packing → Dispatch

Home WhatsApp Call Email